JS 10190-9:2007
Water-tube boilers and auxiliary installations Part 9 : Requirements for firing systems for pulverized solid fuels for the boiler
This standard applies to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized fuel storage system and ends at the ash extraction plant.
General information
-
Status
Published Document (JS)
Publication date
31/12/2007
-
Effiective date
30/06/2008
Number of pages
28
-
-
Note: 16% tax is added to the Standards price